
American steel · Fabricated in USA
Cold-formed steel framing, fabricated in the USA and delivered in erection sequence.
Roof trusses, floor trusses, wall panels, and complete framing kits, engineered to your loads, fabricated to plant tolerances, and sequenced to the crane. Crews assemble instead of cut, so the schedule holds.
What we build
Four products. One steel package.
Everything is engineered to your loads, fabricated in plant, and delivered marked and bundled in the order your crew sets it. Buy one line or the complete frame.

Roof Trusses
Engineered steel roof trusses built to your spans and loads, delivered ready to set.

Floor Trusses
Long span steel floor systems with open webs for mechanicals and flatter, quieter floors.

Wall Panels
Panelized exterior and interior walls, framed and sheathed in plant, delivered numbered and ready to set.

Steel Framing Kits
A complete, numbered steel structure delivered as one coordinated package.
Every package includes
A kit, not a pile of material and a problem.
- Stamped engineering and shop drawings
- Members cut, punched, and marked to the drawing set
- Fastener schedule and assembly drawings
- Bundled and delivered in erection sequence
- Field support until the frame is standing
Why Ber Wilson
What changes when the frame is built in a factory.
Prefab steel is not a preference, it is a schedule and a budget. Here is what moves when the structure is built in a plant instead of a field.
Panels and trusses arrive cut, punched, and numbered, so crews assemble instead of cut.
Steel does not rot, warp, or attract termites, so the frame outlasts a comparable wood build by 50 years or more.
A steel frame adds value to the finished building, for owners who hold it and buyers who inherit it.
Skilled crews stand a structure in days once the steel is on site.
Steel holds its shape, does not burn, and does not attract termites. Steel framing is non combustible; the fire rating of a wall or floor depends on the full assembly, and we design to the rating your code requires.
The comparison
Framed on site, or delivered ready to stand.
The same building, from two directions. The differences are not opinions about steel, they are what changes when the structure stops being built in the weather.
| Factor | Framed on site | Ber Wilson prefab steel |
|---|---|---|
| Where the structure is built | Cut and assembled on site, in whatever weather the week brings. | Fabricated in plant to tolerances a job site cannot hold, then delivered. |
| Framing duration | Months of field labor setting the schedule. | Days to stand the structure once the steel is on site. |
| Weather | Rain, snow, and wind stop framing and soak what is already up. | Fabrication runs regardless. Site work is assembly, and it is short. |
| How the material behaves | Wood can warp, twist, and shrink, and it is vulnerable to fire and termites. | Steel holds its shape, is non combustible, and termites cannot eat it. |
| Waste and rework | Offcuts, shortfalls, and corrections absorbed in the field. | Every member cut, punched, and numbered to the drawing set. |
| Accountability | Several suppliers and a framing sub, each answering for part of the fit. | One package, one set of tolerances, one vendor answering for fit. |
| What sets your date | Framing labor availability in that market. | A delivery date agreed at quote and bundled in erection sequence. |
In the field
Steel on the ground.
Structures going up on our steel: trusses set by crane, panels stacked in sequence, decks sheathed and ready for the next level.








How it works
Quote to standing frame.
Quote
Submit plans, a schematic, or a program description. We return scope, budget, and a delivery window.
Engineering
Stamped drawings and shop details built to your loads and local code.
Fabrication
Steel is rolled, cut, punched, and marked in plant to tight tolerances.
Delivery
Bundled in erection sequence and delivered on your date, not ours.
Install
Your crew assembles, or ours does. Field support until the frame is standing.
Installers
Transition to steel without the learning-curve risk.
Cold-formed steel is assembled with a standard framing crew, and the package arrives numbered in erection order. The only real barrier is the first structure, and we take that one with you.
Send a certified installer to erect it, or have a Ber Wilson supervisor walk your own crew through their first one and certify them for it.

Who we supply
We sell the steel, whether or not we build the job.
Ber Wilson is a design-build contractor that manufactures its own structure. You can buy that structure on its own, with no general contract attached.
Homebuilders and build to rent
The same engineered package repeated across hundreds of units without the quality drift of framing each one by hand.
General contractors
A structural package that lands on your site in erection sequence, so framing stops being the trade that sets your schedule.
Developers and owners
Structure cost and delivery date fixed early enough to underwrite, across one building or a repeated program.
Federal primes and agencies
American steel from a GSA approved builder with USACE quality management, delivered to VA, NAVFAC, and to Army, Navy, Marine Corps, Air Force, and Coast Guard standards.
Where we deliver
Manufactured in the United States from American steel and freighted to your site, bundled in the order your crew sets it. Ber Wilson works through offices in:
Building outside that footprint? Freight is priced with the package rather than ruled out. Send the location and we will tell you what delivery costs.
Questions
What buyers ask before they commit.
Do I need drawings to get a quote?
No. A building type, an approximate square footage, and a location are enough for estimating to come back with a real number. Drawings shorten the back and forth, and a sketch counts as drawings.
How fast do I get pricing?
An estimator reviews your request the same day it lands and responds within one business day, either with a number or with the two or three scope questions standing between you and one. Nothing is automated and nobody puts you on a drip list.
What is actually in a steel package?
Engineering and stamped shop drawings, every structural member cut, punched, and marked to that drawing set, the fastener schedule, assembly drawings, and delivery bundled in the order your crew sets it. You can buy one product line or the complete frame.
When can you deliver?
Lead time depends on the size of the package and how much engineering it needs, so it is quoted rather than advertised. You get a delivery date with the price, before you release anything, and the fabrication schedule is built backwards from that date.
Does my crew need special training or tools?
No specialist trade is required. Cold formed steel goes together with screw guns and a standard framing crew. Members arrive cut, punched, and numbered to the erection drawing, so the work is assembly rather than layout, and our field support stays with you until the frame is standing. If your crew has never stood steel, a Ber Wilson supervisor can walk them through the first one on site and certify your superintendent for it.
Who erects the steel?
Your crew or ours. Most buyers set it themselves because the package is numbered and sequenced for exactly that. If you would rather we did, say so on the quote request and it gets priced with the steel. If you have no crew for it, we can match you with a Ber Wilson Certified Steel Installer working in your region.
Do you provide stamped engineering for permit?
Yes. Every package is designed to your spans, pitches, and load conditions, and to the code in force where you are building. Stamped engineering and shop drawings come with it for permit and inspection.
Is prefab steel more expensive than framing on site?
The sticker on the structure is not the number that matters. Factory precision removes the rework, waste, and weather delay a field framed budget absorbs quietly, and the schedule it saves is usually worth more than the steel itself. Estimating will show you both sides of that on your build.
Can you supply federal and military work?
Yes. Ber Wilson is a GSA approved builder with USACE quality management certification, and has delivered VA and NAVFAC projects and work for the Army, Navy, Marine Corps, Air Force, and Coast Guard. The steel is American. Tell us the solicitation on the quote request and estimating will scope to it.
What if prefab steel is not right for my project?
Then our estimators tell you that. Part of what you get back is where prefab steel beats the alternative on your build and where it does not. A quote costs nothing and carries no obligation.
Get a quote
Tell us what you are building.
Send the scope and we will come back with pricing, lead time, and a delivery date you can build a schedule around. A square footage and a location are enough to start.
Building type and size
Use, number of floors, and approximate square footage. A single number is enough to start.
Location
City and state. It sets the code, the snow and wind loads, and the freight.
Date you are building toward
The delivery date you need to hit, not the one you think we want to hear.
Drawings, if they exist
A full set, a schematic, or a sketch. Anything you have shortens the questions; nothing at all still gets you a number.