Never stood steel before? You will, on your own project, with our supervisor next to you.

Ber Wilson trains framing crews on cold-formed steel and certifies the ones who prove they can set it. Certified installers get a credential they can put on their site, and jobs we send them.

Certified on a real project, not in a classroomNo cost to applyReferral work once you pass

Why this exists

The steel is easy. Being the first one to try it is not.

Cold-formed steel goes together with screw guns and a standard framing crew. Members arrive cut, punched, and numbered to the erection drawing, so the work is assembly rather than layout.

The hard part is the first one. No builder wants to learn a structural system on a job with a schedule attached, and no homeowner wants to hear their frame is somebody's first attempt.

So we take that risk off the table. A Ber Wilson supervisor is on your site for your first steel structure. Your crew does the work. We watch, correct, and sign off.

Ber Wilson Certified Steel Installer badge

Issued to your superintendent by name, with a verifiable credential number.

Two ways forward

Use a certified crew, or become one.

01 · Have it installed

We dispatch a certified installer.

You buy the steel and we send a crew that has already stood it. They mobilize, erect the structure, and demobilize. You never touch the learning curve.

  • Erection quoted with the steel package
  • Crew has passed our installation assessment
  • Fastest route to a standing frame
  • Nothing transfers to your team

02 · Become certified

We train your crew on your project.

You buy the steel, your crew sets it, and a Ber Wilson supervisor is on site to walk them through it. Cheaper than paying an outside crew, because the labor is already yours.

  • Costs less than dispatching an installer
  • Your superintendent earns the certification
  • Your crew can frame steel on its own from then on
  • You get listed and dispatched work from us

Most contractors take the second one on the second project, once they have seen the first go up.

The process

Four steps. The one that counts is a real building.

  1. Apply

    Tell us who your superintendent is, what your crew has framed, and what project you want to certify on. No fee to apply.

  2. Fundamentals

    Self-paced coursework on cold formed steel: erection drawings, member marks and sequencing, connections and fastener schedules, bracing, tolerances, and safety. A few hours, not a semester.

  3. Supervised installation

    A Ber Wilson supervisor is on your site while your crew stands the structure. We assess sequencing, connections, bracing, tolerance, and safety against a written checklist, and correct in real time.

  4. Certification issued

    Pass the checklist and the certification is issued to your superintendent by name, with a certificate, a numbered credential, and badge artwork for your website and proposals.

Who gets certified

Crews who already know how to build.

Wood framers moving into steel

Same trade, different material: a fastener schedule instead of a nail gun, and a certification at the end of it.

Homebuilders framing their own homes

Stop pricing a framing sub into every steel home. Certify a superintendent once and keep the scope on your own crew.

Framing subcontractors

Add a service line your competitors cannot quote, and get put in front of builders who are buying steel and need someone to set it.

Repeat program builders

Running the same home fifty times? Certifying your own crews is cheaper than dispatching ours, every time after the first.

Questions

What contractors ask before they apply.

Who exactly gets certified, the company or the person?

The person. Certification is issued by name to the superintendent or foreman who ran the supervised installation and passed the assessment. Their company can state that it employs a Ber Wilson Certified Steel Installer, and can use the badge while that person is on staff.

Do I have to buy steel from Ber Wilson to get certified?

Yes. The supervised installation happens on a real Ber Wilson steel package, on your project. That is the point of it. There is no classroom-only path.

How long does the whole thing take?

The coursework is a few hours, done on your schedule. The supervised installation takes as long as your structure takes to stand, which for most buildings is days. Certification is issued within a week of the assessment.

What if my crew fails the on-site assessment?

Your building still goes up. The supervisor stays and works the problem, because the frame standing correctly matters more than the certificate. If the checklist does not pass, we tell you exactly which items failed and you can be reassessed on your next project at a reduced fee.

How does renewal work?

Certification runs three years. To renew, submit three completed steel installations from that period and pay the renewal fee. If you have not stood three, you repeat the fundamentals and the supervised installation.

Am I guaranteed work from the referral network?

No, and be sceptical of anyone who promises that. Work is dispatched based on region, capacity, and the buyer's schedule. What certification guarantees is that you are on the list at all.

Apply

Tell us which one you need.

Steel and an installer, or steel and a certification for your own crew. Same form, one question at the top, and an estimator responds within one business day.

We respond within one business day. No drip lists, no obligation.